Static mockups for discussion. Fields are typeable but nothing is wired up. Names and numbers are made up.
Safe areas (a requirement): the red hatched bands at the top and bottom of every phone are the phone's safe areas: the status bar and camera cut-out at the top, and the home indicator you swipe up on at the bottom. The app pads its content with the platform's safe-area insets (env(safe-area-inset-*)), so headers, buttons, tabs and sheets never sit inside them, on any phone, in portrait or landscape.
The day is the operator's home screen and the daily workflow: set the shift, add a docket for each customer job, put any time no customer pays for under a reason, then submit the day. The bar at the bottom shows how the shift is covered: on dockets (green), not billable (grey), and any gap (red). A gap, or dockets running past the shift, warns but does not block submitting. The shift becomes the Xero Payroll timesheet; each docket becomes a draft Xero invoice.
Hours are recorded on every line, even for machines billed per hectare or load, so the day can check them against your shift.
Your shift is 10.0 h but your dockets and not-billable time add up to 9.5 h. Add the missing time so it can be charged or explained, or submit anyway and the office will see the gap.
If dockets add up to more than the shift, the same warning says the shift may be under-recorded.
After sign-in the app opens on today. The tabs along the bottom are Day (opens on today), Pay period (every day in the period with its coverage) and More (sync status, sign out). Tapping a date in the strip or a row in the pay period opens that day. Start and Finish open the client's time picker as a sheet: hour and minute arrows in 15 minute steps, am/pm, and the usual start and finish times as quick buttons. A day can hold several shifts. A finish earlier than the start is the next morning: it is tagged "+1 day", and the whole shift (and its dockets) counts on the day it started.
No dockets yet. Add one for each customer job today.
Workshop, travel to the depot and anything else nobody is charged for.
Minutes move in 15s. Or pick a usual time:
A shift that runs past midnight counts on the day it started, so this whole night is on Mon 2 Nov, and so are its dockets.
Thu 29 Oct was returned by the office: 2.5 h of the shift is not on a docket. Tap it to fix and resubmit. Days you have not submitted stay editable until the office closes the period.
Nothing locks on a date. Each day's status decides what the operator can change: days not submitted, and days the office returned, stay editable until the office closes the period. A submitted day is read-only unless the office returns it. A period goes through three states: current; ended but still open while the office collects late days; and closed, once the office has sent it to Xero Payroll, after which it is read-only history. The arrows in the pay period header step through past periods.
No dockets yet. Add one for each customer job today.
This pay period is closed, so it can be viewed but not changed. If something is wrong, tell the office: they correct it in the next pay run.
There is only one "Submit", and it is for the day. A docket is never submitted on its own: the operator marks it Done when the job is finished (usually on site, straight after the customer signs), and it can still be changed until the day is submitted. Submitting the day sends the shift and all of its dockets to the office together, so nobody can send one and forget the other. Every docket has to be done first: the submit step lists any drafts and lets the operator finish, fix or delete them there. A gap still gets its own warning (E). An operator who submits at the end of the week does it day by day from the pay period list.
This sends your shift and both dockets to the office together. The office checks them before pay and invoicing.
After you submit you can't change this day or its dockets unless the office sends them back to you.
A day goes to the office with all of its dockets, so every docket has to be done first. Mark a finished one done here, fix an unfinished one, or delete it if it was a mistake.
Submit day only becomes available once every docket on the day is done.
Done means the job is finished. You can still change it until you submit the day.
6:00 am to 4:30 pm · 30 min break
Hillview Dairy · 6.5 h · Waiting to send
Ridge Road Farms · 2.5 h · Waiting to send
Workshop · Service on 106
Submitted days are read-only. If something is wrong, ask the office to send the day back.
More holds what an operator needs now and then: whether everything has reached the office (and a manual "Check now"), the docket layout setting, how to reach the office, the app version and signing out. Signing out is blocked while anything is still waiting to send, so nothing entered offline is lost.
Everything on this phone has reached the office. Last checked 2 min ago.
McNeil Timesheet 1.0.0 (build 12)
No signal. These go automatically when the phone is back online:
Signing out now would lose the 3 items above. Wait until they have been sent.